SANReN Connectivity (BFN)

Project Description

Documents

No documents at this time.

Project Progress

100%

Overall Project Completion

  • 20%
  • 60%

100%

  • 40%
  • 80%

Project Discussion 2 Responses to SANReN Connectivity (BFN)

  1. Yvette
    This basic requirements of the project has been addressed. The Potchefstroom to Bloemfontein link is already live and had assisted a lot in terms of redundancy needed when the VDK and Johannesburg link experiences outages. The routing configuration from a TENET side has also been completed. The rest of the outstanding issues, such as the split of local and international traffic will be addressed in the Connectivity Project.
    We can close this project.
    Regards
    Flip

    March 1, 2016 at 6:07 am
    FLIP VAN SCHALKWYK
  2. Project will be updated with the necessary information, including the current status and description of the project.

    February 1, 2016 at 12:38 pm
    FLIP VAN SCHALKWYK

Leave a Reply