UODL: Connectivity and Infrastructure Installation in 10 new Centers

Project Description

    • Phase 3 of the UODL project entails equipping 10x new centrum’s with internet connectivity to facilitate interactive online classes as well as to give students access to the internet for research and learning. The primary infrastructure installations include the installation of a primary Telkom adsl connection as well as a secondary backup link, the configuration and installation of Routers, Firewalls, Switches and Wi-Fi Access Points for each centrum. Infrastructure on the sites will also be remotely supported and monitored.

Project Progress

100%

Project Timing

  • Start
    Mar 01 2016
  • End
    Jul 31 2017

03/01/2016 07/31/2017

100%

Overall Project Completion

  • 20%
  • 60%

100%

  • 40%
  • 80%

1. Ordering of Telkom ADSL Lines Complete 100% Tasks 10 / 10

100%
Description

10 of 10 completedTasks

  • Kimberley
  • Klerksdorp
  • Pongola
  • Lichtenburg
  • Lusikisiki
  • Pietermaritzburg - Die Gereformeerde Kerk
  • Ulundi
  • Benoni
  • Ingwavuma
  • KwaMhlanga

2. Installation Of Telkom ADSL Lines Completed Complete 100% Tasks 10 / 10

100%
Description

10 of 10 completedTasks

  • Kimberley
  • Klerksdorp
  • Pongola
  • Lichtenburg
  • Lusikisiki
  • Pietermaritzburg - Die Gereformeerde Kerk
  • Ulundi
  • Benoni
  • Ingwavuma
  • KwaMhlanga

3. Configuration Of Infrastructure Router, Switches, Firewall and WIFI Access Points Complete 100% Tasks 10 / 10

100%
Description

10 of 10 completedTasks

  • Kimberley
  • Klerksdorp
  • Pongola
  • Lichtenburg
  • Lusikisiki
  • Pietermaritzburg - Die Gereformeerde Kerk
  • Ulundi
  • Benoni
  • Ingwavuma
  • KwaMhlanga

4. Site Installation Completed and Tested Complete 100% Tasks 10 / 10

100%
Description

10 of 10 completedTasks

  • Kimberley
  • Klerksdorp
  • Pongola
  • Lichtenburg
  • Lusikisiki
  • Pietermaritzburg - Die Gereformeerde Kerk
  • Ulundi
  • Benoni
  • Ingwavuma
  • KwaMhlanga